To select the contractor, you will be using:
- Click Docking | Docking.
- Select the docking project you want to select the contractor for.
- Click the “Inquiry” tab.
- Right click the contractor, you wish to select as the one to use.
- Click Select Contractor. You will be presented with a list of the job and specification items that have not been designated (to a contractor).
- Select the items you wish to designate to the chosen contractor.
- Click OK. You will be asked if you want to “Update docking prices and durations from the quotation”.
- If you tick the “update docking prices from quotation”, you will be asked to enter the current currency exchange. (Only applies if the system base currency is different from Contractor currency).
The entered currency will be used to calculate the cost for each individual item in the base(system) currency.